Flexible stone veneer
Coordinate the stone, backing, substrate, adhesive, joints, edges and exposure as one finish assembly.

The online companion to the HDS Field Installation Guide for ultra-thin flexible and illuminated natural stone. Use this page for the sequence; use the downloadable guide for field details and closeout records.
This webpage is the quick planning overview. The downloadable HDS Field Installation Guide is the controlling HDS field document. Project drawings, current product data, manufacturer instructions, applicable code and licensed-trade requirements always take precedence.
Natural variation is part of real stone. Build a representative mockup with the actual stone, substrate, adhesive, joints, finish and lighting. Obtain approval before production installation.
Coordinate the stone, backing, substrate, adhesive, joints, edges and exposure as one finish assembly.
Coordinate stone transmission, diffusion, lighting, frame, wiring, thermal management and service access.
Approve color, seams, corners, bond, finish, cleaning and—when applicable—light quality before continuing.
Do not skip from delivery directly to bonding. The approved composition, substrate and complete assembly determine the result.
Confirm the delivered stone, backing, finish and intended exposure. Determine whether the work is non-illuminated veneer or a translucent system. Review current product, adhesive, substrate and project documents before opening material.
The receiving surface must be flat, sound, dry, stable and free of dust, oil, wax, release agents and weak coatings. Verify moisture, cure time, movement and adhesion. Flexible stone follows the plane beneath it.
Arrange every sheet before bonding. Review tone, movement, vein direction, seams, outlets, corners and lighting alignment. Number the backs and photograph the approved sequence.
Mark the backing, support the sheet completely and test the full cutting or drilling method on a remnant. Control dust, vibration, heat and scratching. Respect device clearances and project details.
Use only an adhesive approved for the stone, backing, substrate and exposure. Work within its open time, create continuous contact and press from the center outward. Verify coverage while the adhesive is fresh.
Complete joints, trims, corners and surface treatment as approved. Remove fresh residue safely and protect the installation for the full product-specific cure. Inspect the work before handover.
Correct irregularities before installation and honor required structural, control, expansion and perimeter joints. Flexible stone is not a crack-isolation or waterproofing membrane.
Interior, wet, exterior and translucent applications may require different products. Verify compatibility, open time, service temperature, moisture resistance and visibility through the stone. Avoid blobs, trapped air and dry edge bands.
Butt joints, expressed joints, flexible filled joints, profiles, edge-to-edge corners and miters create different results. Complete a sample of every unique termination before production work.
Waterproofing, drainage, flashing, vapor control, clearances and movement are separate systems. Confirm exposure, fire and code requirements with current project documentation.
A luminous feature is an engineered assembly—not stone placed over a lamp. HDS should review the panel rhythm, translucency, light quality, drivers, ventilation and future service access before fabrication.
Start a guided projectTest sealers, cleaners, tapes and finishing methods on actual project material. Approve any change in color, sheen or texture before proceeding.
Do not grout, seal, energize lighting, wash, load or release the area until every component reaches its required product-specific cure.
The detailed PDF includes a printable final-quality checklist and project record.
Download the complete 10-page Edition 1.0 for substrate review, layout, fabrication, bonding, details, surface protection, illuminated-system commissioning and project closeout.